Leave your project requirements and we will reply by email after a technical review. All inquiries are private and visible only to the administrator.
| No. | Title | Author | Date | Status |
|---|---|---|---|---|
| 4 | 🔒 UWB RTLS deployment for warehouse logistics | J*** | 2026-07-05 | Answered |
|
Q. We are evaluating CB-UWB Anchor for forklift tracking in a 15,000㎡ warehouse. Could you share anchor density guidelines, budget range, and typical deployment timeline? A. CONTROLBIT — Thank you for your interest. Anchor density depends on rack layout and ceiling height. If you send us a floor plan, we will provide a placement design and quotation. Typical deployment for this scale is 4–6 weeks.
|
||||
| 3 | 🔒 Custom firmware for Moreco3 AHRS (bulk order) | M*** | 2026-06-18 | Answered |
|
Q. We need 200 units of Moreco3 Serial for robotic arm control, with a custom output format at 400Hz. Is customization available, and what is the lead time? A. CONTROLBIT — Yes, custom output format and sampling rate are supported. We have sent the volume pricing and lead time to your email.
|
||||
| 2 | 🔒 BLE AoA indoor positioning accuracy question | S*** | 2026-05-27 | Answered |
|
Q. What real-world positioning accuracy can we expect from the LocationX locator in a retail environment with 4m ceilings? A. CONTROLBIT — Sub-meter accuracy is achievable in typical environments with 3–6m ceilings. Metal structures and interference sources may affect performance, so we recommend a small PoC first.
|
||||
| 1 | 🔒 Wearable device prototype with wireless charging | A*** | 2026-05-02 | Received |
| Q. We are planning a pet activity tracker with IMU motion recognition, BLE connectivity, and wireless charging in a compact form factor. Can you handle the full prototype development? | ||||
Your inquiry is not published on the board — it is sent privately to the administrator. We will reply by email.