Development Inquiry Board

Leave your project requirements and we will reply by email after a technical review. All inquiries are private and visible only to the administrator.

🔒 All inquiries are registered as private posts. Only the author and administrator can view the contents.
No.TitleAuthorDateStatus
4🔒 UWB RTLS deployment for warehouse logisticsJ***2026-07-05Answered
Q. We are evaluating CB-UWB Anchor for forklift tracking in a 15,000㎡ warehouse. Could you share anchor density guidelines, budget range, and typical deployment timeline?
A. CONTROLBIT — Thank you for your interest. Anchor density depends on rack layout and ceiling height. If you send us a floor plan, we will provide a placement design and quotation. Typical deployment for this scale is 4–6 weeks.
3🔒 Custom firmware for Moreco3 AHRS (bulk order)M***2026-06-18Answered
Q. We need 200 units of Moreco3 Serial for robotic arm control, with a custom output format at 400Hz. Is customization available, and what is the lead time?
A. CONTROLBIT — Yes, custom output format and sampling rate are supported. We have sent the volume pricing and lead time to your email.
2🔒 BLE AoA indoor positioning accuracy questionS***2026-05-27Answered
Q. What real-world positioning accuracy can we expect from the LocationX locator in a retail environment with 4m ceilings?
A. CONTROLBIT — Sub-meter accuracy is achievable in typical environments with 3–6m ceilings. Metal structures and interference sources may affect performance, so we recommend a small PoC first.
1🔒 Wearable device prototype with wireless chargingA***2026-05-02Received
Q. We are planning a pet activity tracker with IMU motion recognition, BLE connectivity, and wireless charging in a compact form factor. Can you handle the full prototype development?
Write

Submit an Inquiry

Your inquiry is not published on the board — it is sent privately to the administrator. We will reply by email.

* Your inquiry will be sent privately to the administrator (info@control-bit.com).